Located between the East and West terminals at San Diego’s Lindbergh Field Airport, the International terminal expansion project consisted of grade beam footings, pile caps, mat slab, slab on grade, cast-in-place walls and decks, tarmac paving, curbs and site work concrete. The duration of the concrete work was 8 months and was completed on schedule.